WEEK-12 (Final application check and Submisson)

Author: Prajwal Poudel

Student ID:  12927

For this week
WorkDone
Conducted final user testing in the Android emulator to ensure stable operations across all core features. Minor UI bugs and functional inconsistencies were fixed during this phase. Final code cleanup, optimisation, and validation steps were completed to prepare for submission. The week focused on polishing the system, ensuring smooth navigation, seamless user journeys, and stable data flow across modules. Work concluded with final presentation preparation and submission packaging.

Current status:
Application working as expected in the simulator as well as real device(which was installed turning on usb debugging here surver was hosted from the local laptop itself).

Weekly Work Time Report: https://drive.google.com/file/d/13n0gf5YgeCQEfIh60jVqG5pS795PV28I/view?usp=drive_link




Comments

Popular posts from this blog

Week 3 Activity

Week-5 Report (Food NextDoor)

Research: Reducing Food Waste with Smart Apps